List of Projects

COMPLETED PROJECTS
CURRENT PROJECTS

NazCo Engineering & Construction Sdn Bhd (NazCo), together with its subsidiary HWH Engineering Sdn Bhd, has successfully completed the following projects:

Provide Manpower and Supervision for Fabrication and Erection Works

Location: Kerteh, Terengganu

Client: PT Technic (M) Sdn Bhd

Contract Value: > MYR 5 million

Installation and Erection of Aluminum Dome Roof

Location: Pengerang, Johor

Client: ICE Petroleum Engineering Sdn Bhd

Contract Value: MYR 1 million < Value < MYR 2 million

Manpower Supply for Piping and Structure Works

Location:  Pengerang, Johor

Client: ICE Petroleum Construction Sdn Bhd

Contract Value: MYR 10 million < Value < MYR 15 million

Manpower Supply for Piping Works

Location: Pengerang, Johor

Client: WABAG-Muhibbah JV Sdn Bhd

Contract Value: < MYR 1 million

Provide Manpower and Supervision for Fabrication and Erection of ARU, SRU, SWS, LSSU, and SSU 

Location: Pengerang, Johor

Client: Petrofac E&C Sdn Bhd

Contract Value: MYR 1 million < Value < MYR 5 million

Installation of Aluminum Dome Roof for T-134 

Location: Pulau Bukom, Singapore

Client: Hiap Seng Engineering Limited

Contract Value: < SGD 0.5 million

Procurement, Fabrication, and Construction of 3 Nos of Storage Tanks

Tank Dimension: Each Tank - 41.4m (Inner Dia.) x 28m (Height) 

Location: Tanjung Bin, Johor

Client: PEC (Malaysia) Sdn Bhd

Contract Value: MYR 10 million < Value < RM 15 million

Construction of LPG Double-Wall Tanks

Tank Dimension:

a) Outer Tank - 57m (I.D.) x 31m (Ht.)                  

b) Inner Tank - 55m (I.D.) x 28m (Ht.)

Location: Westport, Klang

Year: 2020

Client: HQC Engineering Malaysia Sdn Bhd (CP6CC)

Field Fabricated Tank Mechanical Works, Shell Replacement Works

Tank Description:

a) Fuel Oil Storage A & B (Takeover) -20.9m (I.D.) x 24m (Ht.)                   

b) Fire Water A (New) - 13.9m (I.D.) x 14.4m (Ht.)                  

c) Desalinated Water A (New) - 15.2m (I.D.) x 16.8m (Ht.)                  

d) Demineralized Water A (New) - 21.3m (I.D.) x 24m (Ht.)                  

e) Post-Treated Storage Water (New) - 10.6m (I.D.) x 10.8m (Ht.)                  

f) Fire Water B (Shell Replacement Works Only)                  

Location: Pulau Indah, Klang

Year: 2023

Client: KNM Process Systems Sdn Bhd

Provision of Technical Advisor (1 pax) for the partial replacement of HMT rim seal in RAPID

Job Description:

Provision of Technical Advisor (1 pax) for the partial replacement of HMT rim seal in RAPID.

Location: Pengerang, Klang

Year: 2023

Client: STS Plant Services Sdn Bhd

3RD PARTY SERVICE FOR BORF V-9510 VESSEL THERMAL INSULATION COATING REPAIR

Job Description:

Supply material, manpower, equipment, & tools for Thermal Insulative Coating using Aerolon for brownfield vessels at PTTEP BORF facility.

Location:  Bintulu, Sarawak

Year: 2024

Client: Dayang Enterprise Sdn Bhd